Which eCoC date applies: 5 July or 29 November?
Understand the eCoC dates for EU legislation, Dutch registration and UK VCA submission. Check vehicle production date, approval scheme and destination.
Manufacturer readiness
Low production volume does not identify the approval scheme. Start with the approval document and destination, then decide which electronic or paper route is permitted and how the team will operate it.
Distinguish EU small-series approval from national small-series approval. For UK work, also distinguish GB medium series and the GB or UKNI national schemes. Keep the approval reference and issuing authority visible in the implementation brief.
VCA includes GB medium series and UKNI EU small series in its eCoC requirements, while GB and UKNI national small series are exempt. RDW also distinguishes national small series in its Dutch registration guidance. Do not transfer an exception between schemes or markets just because both describe a small production run.
Assess manual entry, an existing data export or an API against the available receiving service and expected workload. A low-volume team still needs reliable source data, validation, version control and a named person responsible for corrections.
Keep the relevant authority guidance with the approval record and the date of review. If using an electronic route voluntarily, confirm the current format and submission conditions with the receiver. Voluntary use should still produce a controlled, traceable record.
No. The approval scheme and destination matter. For example, VCA distinguishes included GB medium-series and UKNI EU small-series vehicles from exempt national small-series vehicles.
Choose the exchange method after confirming the receiver’s available services, data quality and workload. An API is an implementation choice, not proof that it is the right route for every small-series manufacturer.
Reviewed . Requirements are defined by the linked authorities and service documentation.
UK guidance updated 2 October 2026: vehicle scope, approval schemes and submission arrangements.
Dutch registration scope, production dates, national small series, IVI 2.0 and electronic seals.
Manufacturer submission choices, the IVI exchange model and the Article 37 timetable.
Understand the eCoC dates for EU legislation, Dutch registration and UK VCA submission. Check vehicle production date, approval scheme and destination.
Choose an eCoC National Access Point and plan manufacturer onboarding, validation, signing, submission responses and corrections. Keep UK VCA delivery separate.
Plan an eCoC electronic seal around the receiving authority’s requirements, authorised entity, certificate, XML format and tested signing workflow.
Manage vehicle data, IVI 2.0 XML validation, signing and submission preparation in one eCoC workflow. Explore the platform and request a manufacturer demo.
Bring your approval scheme, vehicle category and target market. We will map the data, validation, signing and submission steps in a workflow demonstration.
Request a workflow demo