eCoC NAP Outages: A Recovery Plan for European and UK Manufacturers

Prepare eCoC operations for NAP outages: preserve signed records, reconcile uncertain submissions and test an authorised alternative route. EU and UK guidance.

PublishedOctober 16, 2026
Read time7 min
Words1,210
eCoC NAP Outages: A Recovery Plan for European and UK Manufacturers

For vehicle manufacturers, homologation teams and production operations in Europe and the United Kingdom.

A NAP outage needs a controlled recovery process: preserve the released file, distinguish unsent records from uncertain submissions, and use an alternative route only after its access and operating conditions have been confirmed. After service resumes, reconcile the receiver’s results before closing the incident.

This article proposes a manufacturer continuity plan. It covers the operational gap between a vehicle record being ready and the receiving service being available. It does not assume that a manufacturer can guarantee authority availability, route around every downstream dependency or replace a required electronic exchange with a PDF.

Map the failure boundary before activating a fallback

The EReg IVI NAP Q&A discusses applying to two NAP operators as a continuity measure. It also explains that delivery, international distribution and registration involve different parties. An alternative NAP therefore needs advance preparation and may not resolve a failure affecting a shared downstream service.

Identify the affected part of the delivery chain
Observed conditionInitial investigationOperational response to prepare
Manufacturer cannot dispatchLocal application, connection, credentials and signing availabilityHold released records and assign an internal recovery owner.
Selected NAP unavailableOperator notice and the last successful exchangeEvaluate the already authorised alternative route.
Requests time outWhether the receiver processed any requestReconcile uncertain attempts before retrying.
Receiver accepts but retrieval failsOnward availability and the retrieval serviceEscalate with acceptance evidence; avoid uncontrolled new versions.
UK service unavailableVCA service instructions and supportUse the UK recovery procedure; an EU NAP is not a substitute.

Keep three operational queues

A single ‘failed’ status hides the decision that matters most: did the receiver process the record? Use separate operational groups for released-but-unsent files, attempts with a known rejection, and attempts with an unknown outcome. These groups are suggested internal controls, not universal NAP status codes.

  • Unsent: the released file is retained and no dispatch has been confirmed. Its next step is an authorised transmission when the route is available.
  • Rejected: a documented result identifies a problem. The next step is investigation and, where needed, reviewed correction of the source record.
  • Uncertain: transmission may have occurred but the outcome is missing. The next step is status reconciliation or operator support, not an assumed correction.

Freeze the signed release candidate while investigating. Keep its digest, approval context and business version. If vehicle data genuinely needs correction during the outage, handle that through a separately reviewed release decision; do not silently replace the file waiting in the dispatch queue.

Qualify an alternative NAP before production pressure

The EUCARIS implementation guidance describes the manufacturer’s choice of NAP. That choice should become a practical onboarding checklist: confirm the manufacturer identity, accounts, certificate arrangements, supported profile, test route and production permission with the operator. A URL that responds is not evidence of completed onboarding.

  • Record which legal manufacturer is authorised at each receiving point.
  • Confirm the endpoint, environment, applicable IVI revision and signing conditions.
  • Test a representative valid file and a rejected sample through the permitted test process.
  • Agree how request identifiers, repeat submissions and corrections will be reconciled.
  • Record who can activate the alternative and who tells affected production teams.
  • Check whether the apparent alternative shares the dependency that has failed.

Do not promise an automatic switch unless that behaviour has been agreed, implemented and demonstrated for both routes. A controlled manual decision can be appropriate where volumes are low or receiver reconciliation requires human review. The decision should be visible to the people releasing vehicles and handling registration enquiries.

Set recovery targets from the business process

Define an internal target for recognising the outage, a target for deciding how to handle queued records, and a target for reconciling outcomes after recovery. Base them on production schedules, dispatch volumes and registration dependencies. Keep these internal targets distinct from an operator’s published service commitments.

For each target, identify the clock start, responsible person and escalation channel. ‘Resolve immediately’ is not an actionable rule. ‘Operations checks the operator notice and opens a case after the agreed trigger’ can be tested. Neither an internal target nor a software dashboard establishes a legally guaranteed registration time.

Worked recovery exercise

Illustrative exercise: twelve records have not been dispatched, three requests timed out and two files have explicit validation rejections. On service recovery, do not place all seventeen into a common resend batch. Send the twelve through the agreed normal or alternative route; reconcile the three unknown outcomes; assign the two rejections to their data owners.

Then compare the recovered results with the queue and the retained file versions. The exercise passes when each vehicle has an explained outcome and no record was lost or issued again merely because its status was unclear. Use fictitious vehicles in an authorised test environment for rehearsals.

Keep the UK recovery plan explicit

VCA operates a separate UK portal and API rather than an EUCARIS NAP. A manufacturer supplying both markets should document two receiving routes and their support responsibilities. Do not assume that sending a UK record to an EU point fulfils a UK submission obligation.

In the UK plan, retain the account owner, environment, submitted file, receiver response and current support route. Include the same uncertain-outcome scenario in testing. Keep local process documentation current as the receiving service evolves.

Close the incident with reconciliation evidence

  • All held records are accounted for against their released versions.
  • Unknown outcomes have been resolved or remain assigned to an active case.
  • Rejected records have a reviewed correction or a documented next action.
  • Any use of the alternative route is recorded against the affected vehicles.
  • Production and registration contacts receive the confirmed status.
  • The team records one process improvement and an owner for implementing it.

Discuss this plan alongside your NAP delivery preparation and portal or API operating model. Electronic COC can be evaluated against the manufacturer-side visibility and review steps you need; operator access and interface behaviour require their own verification. Arrange a workflow review with a representative outage scenario.

Frequently asked questions

Can a manufacturer prepare a second NAP connection?

EReg’s manufacturer Q&A discusses two NAP operators as a continuity measure. Confirm onboarding, authorisation, supported files and operating procedures with each operator before relying on an alternative in production.

Should every timed-out eCoC request be retried?

A timeout can leave the processing outcome unknown. Follow the receiver’s documented reconciliation and repeat-attempt procedure. Keep the original request reference and released file so that recovery does not create conflicting records.

Can a PDF replace eCoC submission during an outage?

Do not invent an alternative filing method. Follow the authority or receiving operator’s current contingency instructions for the vehicle and destination, and retain any written direction received.

Will a second NAP resolve every EUCARIS outage?

An alternative entry point may still depend on the same receiving country or downstream service. Diagnose the failed boundary and confirm the alternative’s reach before activating it.

Sources and review scope

Reviewed on 16 October 2026. Authority statements below are distinguished from our suggested operating controls. Receiving-system instructions and the applicable approval scheme govern the actual submission.